PHENOMS PRO PAINTERSPremium Quality • Flawless Finish(857) 880-7832Free Estimate

Triple-Deckers & Multi-Family

Triple-Decker & Multi-Family Painting in Somerville

Three-deckers, two-families and rental units — scheduled around tenants, priced to your turnaround date.

Multi-family work is quoted per building or per unit, whichever suits your situation. If you have a fixed move-in date, say so and the estimate is priced to hit it.

A Roxbury hallway painted white, running through to a front door with light on the floorboards

The housing type this city is built from

Somerville is the densest municipality in New England, and the triple-decker is the reason. Street after street of three-story, one-unit-per-floor buildings put up between roughly the 1880s and the 1930s, sitting shoulder to shoulder with barely a driveway between them.

Cayo lives here. This is the stock on his own street.

That matters more than it sounds, because a triple-decker is not a big single-family house. It is a different job with a different set of problems, and a painter who quotes it like a suburban colonial will either lose money or cut the prep to make the number work.

What makes a three-decker different

Access, before anything else. These buildings sit close to the street and close to each other. Staging goes up in a gap measured in feet, around parked cars, on a street where every space is spoken for. That has to be planned rather than discovered.

Three times the vertical surface, and most of it detailed. Three floors of siding, three levels of porch railings, three sets of window casings. The ornate porch woodwork on the Victorian-era ones is beautiful and it is all brush work.

Surfaces with a century of paint on them. Most of these buildings have been repainted many times by many different people. Under the current color there is usually failed caulk, softened trim profiles and areas where the previous coat is barely holding. Scraping back to something sound is the job.

Almost all of it predates 1978. Which makes lead a real planning question rather than a footnote — see the FAQ below, and raise your building when you call.

Working around people who live there

Most multi-family painting happens in an occupied building. Somebody is working from home on the second floor, somebody else leaves at six in the morning, and the stairwell you are painting is the only way any of them get to the street.

So the schedule is built around that. Units go one at a time. The stairwell stays usable. Materials do not live in the shared hallway overnight. The site is cleared at the end of each day, because it is somebody’s home and not a construction site.

For landlords and owner-occupants

A good share of Somerville is investor-owned or owner-occupied-plus-rented — you live on one floor and rent out the other two, or you manage the building from elsewhere.

Either way the practical needs are the same: units turned around fast between tenants, a consistent result across the building, and a number that does not move after the work starts.

One specification across the building is the part most people underestimate. Use a different painter for each unit and you end up with the same nominal color in three different sheens and three different qualities. Write the spec once, record it, repeat it — and the building reads as one property rather than three unrelated apartments.

On turnaround work, tell us the date. A recent job was three large apartments in four days with the team on site. If a tenant moves in on the first, the estimate is priced to have it finished before the first.

Materials

What the job actually needs

The product matters as much as the brand. These are what this kind of job calls for — Benjamin Moore and Sherwin-Williams finishes, plus the standard primers the trade relies on. Ask Cayo which he recommends for your job, and why.

  • Tenant-occupied walls

    Rental walls get moved against, wiped and scuffed. They want a washable finish rather than the cheapest flat

    Benjamin Moore Ultra Spec or Sherwin-Williams Duration Home in an eggshell

  • Stairwells and common areas

    The hardest-worked surface in any multi-family, and the one every tenant sees every day

    A scrubbable eggshell, with a hard enamel on the handrail

  • Exterior on a three-decker

    Three stories of siding, porch railings and trim, facing New England freeze-thaw

    Benjamin Moore Aura Exterior or Sherwin-Williams Duration Exterior

Triple-Deckers & Multi-Family — recent work

Photos from actual jobs

An empty Roxbury bedroom painted white with a refinished hardwood floor
Bedroom, ready to move into
A Roxbury hallway painted white, running through to a front door with light on the floorboards
Hallway through to the front door
A Roxbury kitchen and dining area painted off-white with a hardwood floor
Kitchen and dining area
A Roxbury bathroom painted white with a dark tiled floor and open shelving
Bathroom
A freshly painted white stairway and landing with a carpeted staircase
Stairway and landing
An empty kitchen and dining space with soft gray walls and a wood floor
Kitchen and dining, finished

Questions

Triple-Deckers & Multi-Family — common questions

Do you paint triple-deckers?

Yes. Triple-deckers are the housing type Cayo lives among in Somerville, and multi-unit work suits how he runs jobs — one recent landlord had three large apartments painted in four days.

Can you work around tenants?

Yes. Units are scheduled one at a time around the people living in them, shared entries and stairwells stay passable, and the site is cleared at the end of every day rather than at the end of the job.

How fast can you turn a unit around between tenants?

Three large apartments took four days on a recent job, with the team on site — that one is described in full on our Google reviews. A single unit is typically a day or two. If you are working to a fixed move-in date, say so up front and the estimate is priced to hit it.

Can you quote a whole building at once?

Yes. For exterior work that is usually the sensible way to do it — one walk of the building, one number, one schedule. For interiors you can have the building quoted as a whole and then release units as they turn over.

Why does one specification across the building matter?

Because otherwise the building drifts. Every time a different painter does a different unit with a different product, you get the same color code in a different sheen and a different quality. When a prospective tenant views three apartments in a row, that shows.

My building was built before 1978. What about lead paint?

Almost every triple-decker in Somerville predates 1978, so assume it applies. The EPA Renovation, Repair and Painting Rule regulates paid work that disturbs painted surfaces in pre-1978 buildings, and Massachusetts runs its own certification program. Raise your specific building with Cayo before work is scheduled — it changes how the job is planned and it is better priced honestly at the start.

Where we work

Triple-Deckers & Multi-Family across Greater Boston

Free estimate

Get a free estimate for triple-deckers & multi-family

A free estimate, no obligation. Cayo looks at the job himself and talks you through what it needs.

  • The price you agree is the price you pay. “Completed project and price as agreed upon” — Neal E., Google review.
  • Not sure what you need? Text a photo of the room to (857) 880-7832 and Cayo will tell you what it needs — and what it doesn't.
  • Rather talk? Call or text (857) 880-7832. It goes to the owner, not an office.

Free, no obligation, and Cayo answers personally. Prefer to talk? Call (857) 880-7832 orsend a text.